Tygren Sdn Bhd
  • Home
  • About
    • About Tygren Group
    • Core Values
    • Organisation Structure
    • Policy
  • List of Services
    • Piping Works & Fabrication
      • Fabrication Works
      • Pipeline Maintenance Services
      • Non-Metallic
        • GRP/GRE/GRVE
    • Joint Integrity Solution
      • Flange Management Services
    • Turbocharger Repair Services
    • Electrical & Instrumentation
    • Chemical Cleaning Services
    • Scaffolding Works
    • Manpower Supply
    • Heat Tracing Works
  • Registrations
  • Track Records
  • Gallery
  • Contact Us
  • Tygren HR MS

Gallery

FPSO Berantai Fabrication Works
FPSO Berantai Fabrication Works
Fuel Gas Structure Fabrication
Fuel Gas Structure Fabrication
Keppel Structure Fabrication
Keppel Structure Fabrication
Stucture Fabrication
Stucture Fabrication
GRE Piping System for SCDR-A Phase 1
GRE Piping System for SCDR-A Phase 1
GRE Piping System for SCDR-A Phase 2
GRE Piping System for SCDR-A Phase 2
Yinson - DMR Installation at Helang Integrated Platform
Yinson - DMR Installation at Helang Integrated Platform
Bertam WHP GRE Repair for Firewater System
Bertam WHP GRE Repair for Firewater System
Bintulu - Wafer Type Check Valve's Fire Protection Wrapping
Bintulu - Wafer Type Check Valve's Fire Protection Wrapping
Metallic Pipe Fabrication
Metallic Pipe Fabrication
Tank Fabrication
Tank Fabrication
D12 GRE Pipe Pre-Fabrication
D12 GRE Pipe Pre-Fabrication
BOSIET Training
BOSIET Training
Scaffolder RAPID Pengerang
Scaffolder RAPID Pengerang
  • Ongoing Projects (Restricted Access)
Hestia | Developed by ThemeIsle